logo

The UK District Energy Association Associate Member:

CSW Process Ltd

CSW Process is an accredited LOGSTOR installer, providing high standard pre-insulated pipe and District Heating Solutions across the United Kingdom.

The technologies that we apply in support of our operations are geared towards long-term operability, high operational efficiency and of course valve adding assurances to our clients. The long-term performance and reliability of such utilities and infrastructure is of the upmost importance to CSW Process, whereby we engage with the most effective and thorough due diligence process from conceptual assessments in order to ensure that all such considerations are made with a holistic overview of the assignment in hand. By fostering such an approach from the initial stage, it allows us to demonstrate the highest quality of contracts deliverance.

Our mission is the develop synchrony from supply chain to installation and then to the client to create and implement class leading installations that give added value to the worlds future energy schemes.

As and accredited LOGSTOR installer, CSW Process is a full turnkey option to the District Heating and Industrial pre-insulated, pipe industry. CSW Process can provide supply, design and installations of pre-insulations pipelines for the District Heating installation. We have class 1 welders, civil teams and a team of LOGSTOR approved engineers at our full disposal.

We have serviced such clients' needs as; the University of Manchester, Newcastle University and Veoli (waste to energy plant Leeds).

Our vistion is to supply an in-house solution for the District Heating industry giving clients the option of a full turnkey solution.

Contact

CSW Process Ltd
29 Acacia Drive
Castleford
West Yorkshire
WF10 3PF

Tel: +44 (0)1924 211 700

www.cswprocess.co.uk

Return to the Association Members index page